Marino ware offers a complete line of cold formed steel framing products.
Metal stud ceiling framing details.
Steel framing is easier to handle because steel studs weigh 1 less than wood studs and can be installed at 4 on center.
Long term maintenance costs are reduced because steel.
To keep the ceiling from sagging screw a metal stud on edge perpendicular to the studs.
Steel framing offers marketing advantages because consumers recognize steel as a superior framing product for its fundamental characteristics.
Our metal framing product line includes.
Viperstud drywall framing studs and track structural stud and track shaftwall and area separation systems plastering steel and drywall finishing products as well as our framerite family of proprietary products.
Clarkdietrich cold formed steel c studs general cold formed steel framing faqs general steel home construction faqs new clarkdietrich itools structural stud lookup tool clarkdietrich studs are made in a variety of flange widths to meet different applications.
For pricing and availability.
If there is no room for a stud above attach short studs to each ceiling stud and screw them to the framing above.
Make sure you install the metal studs every 15 25 otherwise they won t be able to support the weight of the plasterboards.
The metal tracks and studs are installed firmly therefore the frame is perfectly level as we have used the laser level.
3 2187 in w x 120 in l x 0 875 in d galvanized steel metal stud.
These products should not be used in design or construction without an independent evaluation by a qualified engineer or architect to verify the suitability.
3 625 in w x 96 in l x 1 25 in d prostud 3 5 8 25 ga galvanized steel metal stud.
We are aggressively working on updating the hundreds of cold formed framing details located in the cad library with updated product information.
The best technique for framing steel walls is to first fasten the floor and ceiling tracks and then install the studs one at a time.
Drywall framing metal studs.
20 products in metal studs.
Bridging fire stops soil pipes etc must not protrude beyond framing.
Then cut short studs to attach to that stud to the framing above about every four feet.
All framing lumber should be the correct grade for the intended use and 38 mm x 89 mm nominal 2 x 4 or larger should bear the grade.
The details contained in this document are intended as a general guide for using steel stud manufacturers association ssma member products.
On the floor lay out and mark the location of the wall fasten the steel track photo 2 and then locate the position of the ceiling track using a plumb bob or a level held against a steel stud.
This brace sits on top of the ceiling studs.
Studs and joists must be in true alignment.
Framing members should be straight true and of uniform dimension.
Contact clarkdietrich technical services at 888 437 3244 for any questions on these details or if you.