Outriggers fully extended 100 40 54 66 78 90 102.
Mobile crane wire rope capacity chart pdf.
Checks maintenance for crane rope hook 21 annexure 4.
Boom walkways auxiliary jib must be deducted to get the net lifting capacity.
With a range of around 25 ltm cranes from a small two axle to the large 9 axle model we have the right crane to suit every requirement.
Fiber core wire rope fc must not be used at tem peratures above 180 f.
A reeving chart which indicates 28 000 lbs.
Internal rcl light bar optional visually informs the operator when crane is approaching maximum load capac ity with a series of green yellow and red lights.
Intersect the two columns and you will get the available line pull on the crane.
This document describes specific criteria to determine when to replace wire rope on cranes.
Additional equipment on boom e g.
Asme b30 5 mobile and locomotive cranes requires a design factor of 3 5 for 6 strand hoist ropes.
The weight of the lifting device hoisting ropes hook block shackle etc must be deducted from the gross lifting capacity to obtain a net lifting value.
Wire rope slings wire rope environmental considerations wire core wire rope iwrc must not be used at temperatures above 400 f.
When to replace your wire rope.
Crane operation is subject to the computer charts and operation manual both supplied with the crane.
We continue to work on developing our cranes all the time variobase varioballast the liccon crane control system and telematics are just some of the innovations from ehingen the location of the most modern crane production plant in the world.
Mobile crane planning risk assessment guidelines 24 annexure 5 signage for height restriction example illustration 26 length 11 annexure 6.
Reference document 2 pages view xlt4 design factor product bulletin.
Xlt4 is designed to be used with a design factor as low as 3 5 on mobile cranes.
Some load charts include the available line pull for each layer of wire rope.
Starlift xtra wire rope has one of the highest strength to diameter ratios on the market.
Wind speed please refer to lift chart in operator s cab or.
Data published herein is intended as a guide only and shall not be construed to warrant applicability for lifting purposes.
This chart takes into consideration both the line pull of the hoist drum of the crane and the safe working load of the wire rope.
The operator when the wire rope is on the first bottom layer and provides a function kickout when the wire rope is down to the last three wraps.
The mbf of starlift xtra is such.
Effect of anchor shackle pin or crane hook on sling eye.
Capacity for a two part reeving will require more reeving prior to making a lift that exceeds 28 000 lbs.
Reeving charts indicate the type of wire rope and the number of parts of wire rope required to lift loads.
Consult operation manual for further details.